By Clay Li on Wednesday, 27 March 2024
Category: Feature

Surfacing Step Conditions in Work Orders

In the coming release of R2024a (for April 2024) a step condition can be surfaced to work orders based on their priorities. Here's the use case:

 1. WO Step Condition

The condition of a work order step can be set by a tech when completing a work order step. The condition is a dropdown with a priority for each value.

2. Step Condition in PM WOs

Steps are present in PM WOs. A tech may set the condition for a PM WO step when needed.

3. Step Condition in CM WOs

Steps are not present in corrective (CM) WOs in general. However, a boilerplate step may be configured for CM WOs to create a step for tech to report condition if needed.

​4. Step Result, PM Needed and CA Taken​

Step result, PM needed, and CA (corrective action) Taken are surfaced like condition from steps. For instance, if a step failed, the work order's step result is failed.

Additional Resources

Related Posts